Now Accepting Inquiries | South Dakota, USA

Mine Smarter. Scale Faster.

Math > Hype Precision over promises

Cryptocurrency mining and colocation services coming to South Dakota. Secure a priority reservation and follow the pilot build from day one.

Limited pilot reservations available

$100
Reservation Slot
FCFS
First Come, First Serve
๐Ÿ“South Dakota
United States
2029
Target Launch

Everything You Need to Mine

From plug-and-play hosting to full-scale colocation, we provide the infrastructure so you can focus on profitability.

โ›๏ธ

ASIC Hosting

Ship us your miners and we'll handle the rest.

  • โœ“Power & cooling
  • โœ“Networking & connectivity
  • โœ“24/7 monitoring
  • โœ“State-of-the-art facility
๐Ÿข

Colocation

Dedicated rack space built to scale, from a single unit to hundreds of machines.

  • โœ“Dedicated rack space
  • โœ“Redundant power systems
  • โœ“Industrial cooling
  • โœ“Flexible capacity
๐Ÿ› ๏ธ

On-Site Service & Repair

Dedicated technicians on-site to keep your machines hashing around the clock.

  • โœ“Rapid diagnostics
  • โœ“Parts replacement
  • โœ“Minimal downtime
๐Ÿ“Š

Real-Time Dashboard

Full visibility into your operation through our custom client portal.

  • โœ“Live hashrate tracking
  • โœ“Power consumption data
  • โœ“Temperature monitoring
  • โœ“Profitability reporting
๐Ÿ›’

Hardware Procurement

Need help sourcing hardware? We can assist with procurement planning, shipping coordination, and deployment guidance.

  • โœ“Latest ASIC models
  • โœ“Deployment coordination
  • โœ“Racked & ready to hash
  • โœ“Pre-order options available
๐ŸŒฑ

Sustainable Energy

A South Dakota site strategy built around climate, infrastructure, and long-term utility alignment.

  • โœ“Cold-weather operating advantage
  • โœ“Transparent utility-based planning
  • โœ“Modular site expansion
  • โœ“Rural infrastructure focus

Built by Miners,
for Miners

We're operators first. Every decision we make is rooted in maximizing uptime and minimizing cost per hash.

โšก

Utility-Aligned Planning

We design around real utility economics, high load-factor operations, and disciplined site selection so scaling decisions stay grounded in actual numbers.

๐Ÿ”’

Enterprise Security

24/7 surveillance, biometric access control, and redundant power failover systems to ensure uninterrupted communication.

๐Ÿ“ˆ

Transparent Reporting

No hidden fees. Real-time dashboards and monthly reports so you always know where you stand.

๐Ÿค

Third-Party Firmware Support

We support leading firmware solutions including Braiins, Vnish, and NiceHash, giving you full control over tuning, efficiency, and pool selection.

From Ground to Hashrate

Follow our journey from site acquisition to first machine startup. We're building this transparently, every step of the way.

โœ“
Q1 2026

Company Formation

DigitalQuarry LLC established. Core team assembled and business plan finalized.

Q1 2028

Site Acquisition

Securing land and facility in Eastern South Dakota. Evaluating locations for optimal power access and infrastructure.

3
Q2 2028

Permitting & Compliance

Securing all local and state permits, zoning approvals, and environmental compliance certifications for full-scale operations.

4
Q3 2028

Power & Utility Agreements

Negotiating energy rates with local utility providers following permit approvals. Finalizing electrical infrastructure requirements.

5
Q4 2028

Community Partnerships

Establishing relationships with local government, energy cooperatives, and regional economic development groups to ensure long-term alignment.

6
Q1 2029

Facility Build-Out

Construction and outfitting of the mining facility: electrical, cooling, networking, and security systems.

7
Q2 2029

Infrastructure Testing

End-to-end testing of power delivery, cooling systems, networking, and monitoring platforms. Stress-testing at partial capacity.

8
Q3 2029

Initial Client Operations

Onboarding early reservation holders for live operations, validating infrastructure, support workflows, and dashboard tools before full commercial launch.

9
Q4 2029

Hardware Procurement

Sourcing and ordering ASIC miners at scale. Reservation holders receive priority placement and deployment coordination as the pilot site comes online.

10
Q1 2030

Full Launch

Full commercial operations expected: all reservation holders onboarded, miners powered on, and hashing.

Your Command Center Coming Soon

A glimpse at the dashboard we're building for you. Real-time data, full control, total transparency.

portal.digitalquarry.io
Preview Mode
๐Ÿ“Š Dashboard
๐Ÿ–ฅ๏ธ Machines
โšก Overclock
๐Ÿ“ท Live View
๐Ÿ›’ Marketplace
๐ŸŽซ Support
Dashboard
Welcome back, DigitalQuarry
All Systems Online
Last sync: 12s ago
โšก
0
Total TH/s
๐Ÿ’ฐ
0
Daily BTC Earned
๐Ÿ”Œ
0
kW Power Draw
๐ŸŒก๏ธ
0
Avg Temp ยฐC
Hashrate (24h) +2.4%
Power & Efficiency W/TH Ratio
Recent Activity View All
Miner S21-007 back online2 min ago
Pool switched to Ocean18 min ago
Block reward: 0.00021 BTC1 hr ago
Firmware update applied (3 units)3 hrs ago
Machines
4 Active | 0 Offline
Pool: Ocean
Firmware: Braiins
S21 Hyd #001
Antminer S21 Hydro 335T
Hashrate332.1 TH/s
Temp58ยฐC
Power5,200W
Efficiency15.7 W/T
Uptime99.8%
PoolOcean
S21 Hyd #002
Antminer S21 Hydro 335T
Hashrate328.7 TH/s
Temp61ยฐC
Power5,180W
Efficiency15.8 W/T
Uptime99.6%
PoolOcean
S19k Pro #003
Antminer S19k Pro 120T
Hashrate118.4 TH/s
Temp65ยฐC
Power2,760W
Efficiency23.3 W/T
Uptime100%
PoolOcean
T21 #004
Antminer T21 190T
Hashrate188.2 TH/s
Temp63ยฐC
Power3,610W
Efficiency19.2 W/T
Uptime99.9%
PoolOcean
Overclock Studio
Fine-tune performance per machine
โš ๏ธ Advanced
S21 Hyd 001
S21 Hyd 002
S19k Pro 003
T21 004
Frequency Control
Core Frequency675 MHz
500 MHz850 MHz
Voltage1,280 mV
1,100 mV1,500 mV
Fan Speed78%
Auto100%
Tuning Presets
๐ŸŒฟ
Eco Mode
Low power, max efficiency
โš–๏ธ
Balanced
Default, optimal W/TH
๐Ÿ”ฅ
Performance
Max hashrate, higher power
๐Ÿ’€
Beast Mode
Extreme OC | use with caution
Live Impact Preview
Est. Hashrate
348.5 TH/s
+4.9%
Est. Power
5,480W
+5.4%
Efficiency
15.7 W/TH
โˆ’0.5%
Board Temp
64ยฐC
+6ยฐC
Live Container View
Container Alpha | Rack B, Slot 4-7
Feed Active
Camera 02
LIVE CAM 02 | 1080p
Container Alpha | Rack B โ€”
Container Environment
๐ŸŒก๏ธ
24.3ยฐC
Ambient
๐Ÿ’ง
38%
Humidity
๐ŸŒฌ๏ธ
4.2 m/s
Airflow
๐Ÿ”Š
72 dB
Noise
Rack Layout โ€” Your Machines
B4
S21 #001
B5
S21 #002
B6
S19k #003
B7
T21 #004
B8
B9
B10
B11
B12
B13
B14
B15
Your Slots
Other
Marketplace
Purchase miners & services, deployed directly to your slot
โ›๏ธ Miners
๐Ÿ”ง Services
๐Ÿ”Œ Accessories
In Stock
โ›๏ธ
Antminer S21 Hydro
335 TH/s ยท 5,360W ยท Hydro
$5,200โ‰ˆ 0.048 BTC
Ships & deploys in 3-5 days
In Stock
โ›๏ธ
Antminer S21 XP
270 TH/s ยท 3,645W ยท Air
$3,800โ‰ˆ 0.035 BTC
Ships & deploys in 3-5 days
Pre-Order
โ›๏ธ
Antminer S23
400 TH/s ยท 5,000W ยท Hydro
$8,400โ‰ˆ 0.078 BTC
Est. Q3 2026 delivery
Service
๐Ÿ› ๏ธ
Board Repair
Diagnostics + component-level fix
$150per board
48hr turnaround on-site
Support & Requests
Submit tickets, track issues, request services
Open Tickets2 Active
S21 #001 โ€” Fan speed abnormal
Opened 2 hours ago ยท Assigned to Mike T.
In Progress
Request: Move S19k #003 to Rack C
Opened yesterday ยท Pending review
Pending
Firmware update request | Vnish latest
3 days ago ยท Completed by Alex R.
Resolved
Quick Actions
๐Ÿ”„ Reboot Machine
๐Ÿ“ธ Request Photo of Rig
๐Ÿ”ง Schedule Maintenance
๐Ÿ“ฆ Ship Machine Out
Response Times
Avg. first reply< 1 hour
Avg. resolution4.2 hours
Satisfaction98.5%

This is a preview of the client portal we're building. Founding miners will be the first clients invited to use the DigitalQuarry portal when it goes live.

Reserve Your Slot

Math > Hype

Math Is Greater Than Hype

DigitalQuarry exists to build a disciplined, transparent, and scalable mining operation grounded in efficiency, compliance, and real numbers. We prioritize measurable performance, responsible growth, and operational integrity. Every decision is driven by math, not hype.

๐Ÿ“
Precision
Every watt measured, every bit of hashrate optimized
๐Ÿ“Š
Efficiency
Measured operating efficiency, transparent economics
โš™๏ธ
Execution
Real-world results, not empty promises

Founding Miner Program

Secure your position in the DigitalQuarry pilot with a $100 reservation. Founding miners receive priority deployment, direct operator access, and first priority on future expansion capacity.

๐ŸŽŸ๏ธ
$100
One-Time Reservation Fee
Public Pilot Slots 2 / 70
68 public slots remaining โ— Available

Founding miners are onboarded manually so every detail stays secure and verified. Reach out first, review the pilot structure with us, and then complete your reservation by invoice or verified USDC address.

  • Priority deployment in the Phase 1 pilot
  • Pilot hosting rate target: $0.0875/kWh all-in
  • Direct operator access from reservation to energization
  • Priority access to future expansion capacity
  • Early access to the DigitalQuarry client dashboard
Inquire Now

Accepted Payment Methods

QuickBooks
QuickBooks
Invoice & Card
USDC
ERC-20

Limited slots available. Fully refundable if we don't launch.

Frequently Asked Questions

Quick answers to the most common questions we get from prospective clients.

Our 70-slot limit isn't arbitrary, it's calculated. Here's the math behind Phase 1 capacity:

Phase 1 Power Budget

3-Phase Transformer Rating Planned 340โ€“350 kW 340โ€“350 kW range
Phase 1 Cap (70 slots) 245 kW
Load at 70 slots ~71% of rated capacity
Built-in headroom 24.5 kW reserved

Staying well under 80% of transformer capacity keeps us in the safe operating zone, accounting for client overclocking, power spikes, and future hardware upgrades. The 24.5 kW of headroom isn't wasted space; it's reliability insurance.

This is what Math > Hype looks like in practice: a hard ceiling that protects every client's uptime, not a marketing number.

The $100 fee secures your priority slot for colocation space when our facility launches. Here's exactly how it works:

How Your $100 Is Applied

Your reservation is fully refundable until your ASIC is deployed and the 1-year hosting contract is signed. At deployment:

  • โœ“$100 is applied as a credit toward your first month's hosting bill

๐Ÿ”’All reservation funds are held in a dedicated Colocation Reservations account and are fully auditable.

Changed your mind? See our full refund policy for details on how refunds work by payment method.

What You Get

  • โœ“Priority slot when facility launches.
  • โœ“Priority placement in the pilot queue.
  • โœ“Early access to client dashboard the moment it becomes available.
  • โœ“Direct line to founding team.
  • โœ“Roadmap updates & insider reports.

Our current pilot hosting target is $0.0875/kWh all-in for founding miners.

That number is based on the utility pricing guidance we have today, our expected pilot load profile, and the margin needed to operate the site responsibly during Phase 1.

This is a pilot-phase rate, not a forever rate. As we scale load and expand capacity, our economics improve, and founding miners will receive priority access to future capacity at scaled rates.

We would rather quote an honest pilot number now than advertise a rate that only works on paper.

Our Phase 1 facility is planned for Northeastern South Dakota, USA. Final site selection is being narrowed down around utility access, rural compatibility, and long-term build practicality. We chose our home region for its cool climate, available land, and strong fit for a measured pilot build.

The DigitalQuarry Founding Miner Program is our early-access structure for Phase 1 clients who want to reserve deployment space before the pilot facility goes live.

Founding miners receive priority deployment, direct operator access, and first priority on future expansion capacity as we scale beyond the initial pod.

It is designed for miners who value transparent build-out, disciplined operations, and a long-term relationship over hype or unrealistic launch pricing.

We accept QuickBooks invoices and USDC on ERC-20. We handle reservations manually on purpose so every payment, invoice, wallet address, and agreement is verified directly.

Reservation funds are kept in a dedicated separate reservations account and remain fully auditable.

Once we connect and answer your questions, we send the exact invoice or verified wallet address that applies to your reservation.

Yes! We fully support third-party firmware including Braiins, Vnish, and NiceHash.

You keep complete control over tuning, efficiency, and your choice of mining pool. If you're running a firmware we don't support yet, just get in touch with us and we'll work with you to integrate it. The only requirement is that it doesn't affect facility-wide stability or uptime.

Yes, we do! Our founder personally handles most on-site repairs with extensive hands-on experience in control-board diagnostics/repairs, thermal repasting, ribbon cables, firmware flashing, and general maintenance to get your miners back online quickly.

For deeper hashboard-level work, we partner with trusted certified technicians and will coordinate the repair at the customer's expense to ensure it's done right the first time. We're continuously building healthy relationships with trusted technicians so the process stays seamless for you.

If you'd rather use your own technician, that's completely fine too! Just set it up and let us know the shipping details so we can get your machine to them quickly.

Our Phase 1 facility is targeted for initial client operations in 2029, with full commercial operations expected in 2030.

We deliberately chose this conservative timeline so we can finalize utility design and site selection, complete all permitting and infrastructure work, and build everything right the first time.

If utility capacity becomes available earlier, we will accelerate the schedule and notify every reservation holder immediately.

Absolutely, 100% yes!

If DigitalQuarry does not launch, or if you change your mind for any reason before the final contract is signed, we will issue a full refund of your $100 reservation.

QuickBooks (Card or ACH): You will receive the net amount after standard processing fees (typically $5โ€“$7 total). We cannot absorb these fees on refunds.
USDC on ERC-20: You will receive the full $100 back, we cover the tiny gas fees.

We're committed to transparency and will keep every reservation holder updated on any timeline changes due to permitting, zoning, power contracts, or other hurdles.

It's simple and fully manual so everything stays transparent:

  1. 1.Reach out to us first via the contact form or email us at contact@digitalquarry.io.
  2. 2.We'll reply within 24โ€“48 hours, answer any questions, walk you through the details, and send you a personalized QuickBooks invoice (or USDC ERC-20 wallet address).
  3. 3.Once we receive your $100 reservation payment, we'll confirm your position in the founding miner queue and send your reservation agreement and next-step details.

This manual process keeps reservations secure, documented, and fully auditable from first contact through signed agreement.